NEW QUESTION 10
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

  • A. Create accounting
  • B. Transfer Transactions from Production to Costing
  • C. Transfer Transactions from Inventory to Costing
  • D. Transfer Costs to Cost Management

Answer: B

 

NEW QUESTION 11
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

  • A. The Automatically Transact check box is deselected.
  • B. The Automatically Transact check box is selected.
  • C. The Count Point check is selected.
  • D. The Count Point check box is deselected.
  • E. There are no components attached to it.

Answer: A,D

 

NEW QUESTION 12
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

  • A. Manufacturing Supervisor
  • B. Production Supervisor
  • C. Production Operator
  • D. Production Engineer
  • E. Manufacturing Engineer

Answer: E

 

NEW QUESTION 13
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type.

  • A. Publish cost planning scenario to Accounting.
  • B. Transfer Transactions from Inventory to Costing.
  • C. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.
  • D. Create Accounting Distributions.
  • E. Transfer transactions from production to Costing.
  • F. Build cost planning scenario and perform cost roll up.

Answer: B,C,D

 

NEW QUESTION 14
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?

  • A. Create and update ATO (Assemble To Order) model work definitions
  • B. Populate Descriptive flexfields
  • C. Update Work Definitions
  • D. Create Work Definitions

Answer: A,B

 

NEW QUESTION 15
To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.

  • A. Change the Supply Type = Push in Item definition and Work Definition, for subassemblies having high inventory stock.
  • B. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
  • C. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
  • D. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.

Answer: B

 

NEW QUESTION 16
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items with some overlap between them in terms of products manufactured. The distribution centers stock parts from all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants are allowed to change some attributes locally.
Identify two different ways of achieving this requirement.

  • A. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and Corporate Engineering organizations as Item Organization.
  • B. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Item Organization.
  • C. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Inventory Organization.
  • D. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate Engineering organization as Inventory Organization.
  • E. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering organization as Item Organization

Answer: A,E

 

NEW QUESTION 17
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report production exception and who gets notified after an exception is raised?

  • A. The Production Operator can report and exception and the application generates a notification that is sent to all users who have access to the manufacturing plant.
  • B. The Production Operator or Manufacturing Engineer can report an exception and notifies the production supervisor using Oracle Social Network since there is no system generated notification.
  • C. The Production Operator can report an exception and the application generates a notification that is sent to all users with the role of production supervisor who have access to the manufacturing plant.
  • D. The Production Operator can report an exception and notifies the production supervisor using Oracle Social Network since there is no system-generated notification.

Answer: C

 

NEW QUESTION 18
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

  • A. Review Dispatch List
  • B. Review Production Transaction History
  • C. Report Resource, Material and Operation Transactions
  • D. Manage Work Orders

Answer: D

 

NEW QUESTION 19
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

  • A. The Costing Interfaced Attribute is enabled in the resource definition.
  • B. The Manage Item Rules setup is not complete.
  • C. The item was made inactive after the Work Order transaction.
  • D. The Costing Interfaced Attribute is not enabled in the resource definition.

Answer: D

 

NEW QUESTION 20
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

  • A. The engineer does not have Data access to Item Structures.
  • B. The engineer does not have the Manage Work Definitions function privilege.
  • C. The engineer does not have Data access to Items Attributes.
  • D. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
  • E. The engineer does not have Data access to Items.

Answer: B,D

 

NEW QUESTION 21
Your customer has the following business requirement. There are two work definitions created in the application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.

  • A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for Engine.
  • B. The two Work Definitions can be tied through Project or Seiban numbers.
  • C. The Work Definition versions can be used to tie the Work Orders.
  • D. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work Definition for Pallet.

Answer: C

 

NEW QUESTION 22
In a manufacturing cloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Receipts
  • B. Report Material Transactions by Quantity and Serial Number
  • C. Report Cost Transactions
  • D. Report Resource Transactions
  • E. Report Component Returns

Answer: B,D

 

NEW QUESTION 23
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.

  • A. The user doesn't have Data access to create item structure.
  • B. The user doesn't have Override Item Structure Components in the Work Definition privileges.
  • C. An item cannot be assigned on an ad hoc basis.
  • D. The user doesn't have access to the PIM module.

Answer: C

 

NEW QUESTION 24
Your customer has defined the work definitions. They have created and saved a new version for the work definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?

  • A. State Date
  • B. Costing Priority
  • C. Version
  • D. Production Priority

Answer: A,C

 

NEW QUESTION 25
In your customer's manufacturing facility, different types of Movement Requests are created. Key manufacturing components are issued to the work orders form the manufacturing subinventory. The manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse subinventory?

  • A. Requisition Movement Requests
  • B. Pick Wave Movement Requests
  • C. Batch Wave Movement Requests
  • D. Replenishment Requests

Answer: A

 

NEW QUESTION 26
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for that week.

  • A. 60 hours
  • B. 78 hours
  • C. 70 hours
  • D. 76 hours

Answer: B

 

NEW QUESTION 27
Your customer has completed the required setup steps for automatic work definition. Identify the option that shows the navigation steps needed to create an automatic work definition.

  • A. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation> Actions> Create automatic work definition
  • B. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition
  • C. Product Management> Product Information Management> Items> Edit Item > Actions> Create automatic work definition
  • D. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work definition

Answer: A

 

NEW QUESTION 28
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

  • A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
  • B. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
  • C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
  • D. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK

Answer: B

 

NEW QUESTION 29
......