Best Way To Study For SAP C_TS422_2021 Exam Brilliant C_TS422_2021 Exam Questions PDF [Q27-Q46]

Share

Best Way To Study For SAP C_TS422_2021 Exam Brilliant C_TS422_2021 Exam Questions PDF

Updated Verified Pass C_TS422_2021 Exam - Real Questions and Answers

NEW QUESTION # 27
Which item statuses can you select inside a material BOM?

  • A. Sales
  • B. Service
  • C. Quality management
  • D. Engineering

Answer: A,D


NEW QUESTION # 28
You want to use capacity availability checks for production orders. Which settings have to be made for this?

  • A. A checking rule must be assigned in the checking control
  • B. The PRT Availability Check must be set in the checking control.
  • C. An overall profile must be assigned in the checking control.
  • D. The Relevant for Finite Scheduling indicator must be set

Answer: C,D


NEW QUESTION # 29
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Integrated Business Planning (IBP)
  • B. Material Requirements Planning (MRP)
  • C. Capacity Requirements Planning (CRP)
  • D. Supply Chain Management(SCM)

Answer: A,D


NEW QUESTION # 30
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple operations are maintained for one product
  • B. When multiple production versions are maintained for one product
  • C. When alternate resources are used within one operation
  • D. When multiple planned orders exist on one resource

Answer: C


NEW QUESTION # 31
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A. Create object selection variant for transportation lane-related alerts.
  • B. Create object selection variant for product-related alerts.
  • C. Assign the alert profile to the overall profile.
  • D. Assign the overall profile to the authorization profile.

Answer: B,C


NEW QUESTION # 32
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

  • A. Use the batch information cockpit.
  • B. Use the material staging report.
  • C. Use batch determination.
  • D. Use the material where-used report.

Answer: A


NEW QUESTION # 33
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

  • A. The number of leading zeros for internal numbers is client-specific.
  • B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
  • C. In Customizing you can decide by material type whether to use the long material number.
  • D. The display template for material numbers applies to all clients.

Answer: B,D


NEW QUESTION # 34
What happens to this dependent requirement when you convert the planned order into a production order?

  • A. They are converted into a reservation.
  • B. They are converted into a schedule line.
  • C. They are converted into a production order.
  • D. They are converted into a planned order.

Answer: A


NEW QUESTION # 35
You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?

  • A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • B. Add the agreement to the quota arrangement and mark it for MRP revalance.
  • C. Add the agreement to the source list and mark it for MRP revalance.
  • D. Set the creation indicator for purchase requisitions on initial screen of MRP run

Answer: A,C


NEW QUESTION # 36
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?

  • A. Change the item category of the phantom assembly in the BOM.
  • B. Change the explosion type of the phantom assembly in the BOM.
  • C. Change the phantom item indicator for the phantom assembly in the BOM.
  • D. Change the special procurement key of the phantom assembly in the BOM.

Answer: B


NEW QUESTION # 37
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you create a planned order
  • B. When the MRP result are saved
  • C. When you create a sales order
  • D. When you deliver a sales order

Answer: C


NEW QUESTION # 38
Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?

  • A. Production orders specific stock is created
  • B. Net requirement calcualtion is sales-order specific.
  • C. A sales-order-specific planning run is required.
  • D. Storage location MRP areas are required.

Answer: A,B,C


NEW QUESTION # 39
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Consumption-based planning
  • B. Material requirements planning
  • C. Forecast planning
  • D. Manual planning without check

Answer: A


NEW QUESTION # 40
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To stage different components for a production line simultaneously
  • B. To provide timely updates of inventory management for the staged components
  • C. To determine the work in progress along the production line
  • D. To reduce the total production lead time for along production line

Answer: B,C


NEW QUESTION # 41
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Backflushing
  • B. Kanban
  • C. Material requirements planning
  • D. Production order release

Answer: C


NEW QUESTION # 42
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planed order's component availability is checked.
  • B. The planned order's components are copied to the picking list.
  • C. The planed order generates capacity requirements
  • D. The planed order is converted to production order.

Answer: C


NEW QUESTION # 43
Which chart types does the tabular planning table provide in SAP S/4HANA

  • A. Work center capacities chart
  • B. Capacity requirements chart
  • C. Order (pool) chart
  • D. Order (dispatched) chart

Answer: A,B


NEW QUESTION # 44
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

  • A. 100% check
  • B. Simultaneous
  • C. By usage probability
  • D. First in first out (FIFO)

Answer: A,C


NEW QUESTION # 45
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Variable-size item
  • B. Work item
  • C. Non-stock item
  • D. WBS item

Answer: A,C


NEW QUESTION # 46
......

Updated PDF (New 2023) Actual SAP C_TS422_2021 Exam Questions: https://www.prep4pass.com/C_TS422_2021_exam-braindumps.html

Dumps Moneyack Guarantee - C_TS422_2021 Dumps Approved Dumps: https://drive.google.com/open?id=1mW1OC-VSkiJzZc6LfhL5HMJuFg8ghf7G