The certification "SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7" verifies the knowledge in the area of Production for the consultant profile. This certificate proves that the candidate has a basic understanding within this consultant profile and can implement this knowledge practically in projects. The SAP Certified Application Associate can contribute to the success of the planning and implementation phases of the project in a mentored role and would typically have a maximum of three years experience in the solution area. Project experience should not be prerequisite for a competent and well trained candidate to pass this exam.
NEW QUESTION 26
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)
- A. Standard values in the operations of routings
- B. General operation values of routings
- C. User-defined fields in the operation of routings
- D. General item values of bill of materials
- E. General values from work scheduling view of the material master
Answer: A,B,C
NEW QUESTION 27
Which functions can be triggered before releasing a production order? (Choose three)
- A. Confirmation
- B. Selection of a BOM
- C. Selection of a routing
- D. Stock determination
- E. Scheduling
Answer: B,C,E
NEW QUESTION 28
Where in the SAP ECC system can you define production versions?
- A. In the work center
- B. In the material master
- C. In the bill of material
- D. In the routing
Answer: B
NEW QUESTION 29
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40.
Which sequence category do you use to create the second sequence in the system?
- A. Finish-start relationship
- B. Parallel sequence
- C. Alternative sequence
- D. Standard sequence
Answer: C
NEW QUESTION 30
Which of the following master data is necessary for the creation of material reservations for production orders?
- A. Production/resource tools
- B. Routings
- C. Material master records
- D. Production versions
Answer: C
NEW QUESTION 31
Where can you define the valid receivers for production order costs?
- A. In the valuation variant
- B. In the production scheduling profile
- C. In the settlement profile
- D. In the costing variant
Answer: C
NEW QUESTION 32
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
- A. Goods receipt for a missing part
- B. Release of the production order
- C. Creation of the production order
- D. Goods receipt for the product produced with the order
- E. Confirmation of the operation that the materials being checked are assigned to
Answer: B,C
NEW QUESTION 33
Which of the following properties applies to multi-site planning in SAP ECC?
- A. Both withdrawal from an alternative plant and stock transfer from another plant are defined via special procurement keys.
- B. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
- C. The use of "scope of planning" is always mandatory for multi-site planning.
- D. Multi-site planning can be activated using the corresponding planning strategy.
Answer: A
NEW QUESTION 34
Which option for selecting a routing exists when you create a production order?
- A. Automatic selection based on the selection ID in the material master
- B. Manual selection based on settings in the order type-dependent parameters
- C. Manual selection based on the list of routings maintained in the material master
- D. Automatic selection of a reference operation set
Answer: B
NEW QUESTION 35
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)
- A. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
- B. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.
- C. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production.
- D. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.
Answer: B,C
NEW QUESTION 36
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)
- A. Logistics Information System (LIS)
- B. Pick list
- C. Material directory
- D. Pull list
- E. Automatic generation of a transport order
Answer: B,D,E
NEW QUESTION 37
You select the master data for production orders via production versions.
Which information is contained in a production version?
- A. The default order type to be used
- B. The routing and BOM alternatives to be used
- C. The explosion dates for the routing and BOM
- D. The control parameters for selecting routings and BOM
Answer: B
NEW QUESTION 38
Which of the following master data can be used with process orders? (Choose three)
- A. Production/resource tools
- B. Production versions
- C. Resources
- D. Serial numbers
- E. Master recipes
Answer: B,C,E
NEW QUESTION 39
You want to reduce the uncertainty caused by fluctuating requirements for a finished product by using a dynamic safety stock in SAP ECC.
On which specifications is the dynamic safety stock calculation based?
- A. The static safety stock and the material forecast
- B. The average daily demand and the desired range of coverage
- C. The static safety stock per day and the safety time
- D. The average daily demand and the safety time
Answer: B
NEW QUESTION 40
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
- A. Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning
- B. Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning
- C. Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning
- D. Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning
Answer: A
NEW QUESTION 41
Which function is supported by production orders?
- A. Automatic selection of a work center at order release
- B. Automatic reading of PP master data at order release
- C. Automatic creation of transfer orders at order release
- D. Automatic printing of order documents at order creation
Answer: C
NEW QUESTION 42
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
- A. Activate the availability check and assign an overall profile in the production scheduling profile.
- B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
- C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
- D. Assign an appropriate availability checking rule to the material master for the product.
Answer: C
NEW QUESTION 43
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
- A. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.
- B. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
- C. Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.
- D. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.
Answer: A
NEW QUESTION 44
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)
- A. LTP focuses on the operational planning of important components.
- B. LTP creates purchase requisitions for external procurement.
- C. A planning scenario must be released before it can be used in LTP.
- D. Reorder point planned materials can be included in LTP.
Answer: C,D
NEW QUESTION 45
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
- A. Batch record
- B. Material identification and reconciliation
- C. Availability check
- D. Resource selection
- E. Digital signature
Answer: A,B,E
NEW QUESTION 46
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
- A. The planning of MPS and non-MPS items is always carried out in one planning run.
- B. MPS items can be defined on plant level.
- C. MPS items can be defined on MRP area level.
- D. Non-MPS items can be taken into consideration by an MPS run.
- E. MPS items are planned in a standard MRP run.
Answer: B,C,D
NEW QUESTION 47
Which data forms the basis for calculating the capacity requirement for an operation?
(Choose three.)
- A. In-house production time (material master)
- B. Formulas (work center)
- C. Standard values (routing)
- D. Operation control key (routing)
- E. Transport time (routing)
Answer: B,C,D
NEW QUESTION 48
Which property applies for consumption with planning strategy 40 (planning with final assembly)?
- A. Consumption can reduce the total originally planned production quantity.
- B. Consumption can increase the total originally planned production quantity.
- C. Consumption takes place with the planning material.
- D. Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process.
Answer: B
NEW QUESTION 49
What are the names of the objects for process integration of production orders? (Choose two)
- A. PI sheets
- B. Control instructions
- C. Work instructions
- D. Control recipes
Answer: B,C
NEW QUESTION 50
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?
- A. Maintenance notifications
- B. Goods issues
- C. Confirmations
- D. Goods receipts
Answer: C
NEW QUESTION 51
......
SAP PP Certification Exam Details:
| Exam Price | $550 (USD) |
| Exam Code | C_TSCM42_67 |
| Sample Questions | SAP PP Certification Sample Questions |
| Level | Associate |
| Reference Books | SCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365 |
| Schedule Exam | SAP Training |
| Passing Score | C_TSCM42_67 - 63% |
| Duration | 180 mins |
| Exam Name | SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Number of Questions | 80 |